Descrição
Inscrição
Steel bobbin with massive flanges/barrel/bore and hub.
Dimension either according to customers specification
Dynamically balanced for speed from 25m/s–50m/s
For cable,ferrous and non-ferrous wire.
For drawing, stranding and bunching machines
Tipo
|
Especificação
|
D1
|
S
|
D2
|
L2
|
L1
|
D4
|
R
|
E
|
Plastic Barrel
|
300
|
300
|
12
|
160
|
160, 200, 250
|
185, 225, 275
|
30, 36, 40
|
7.5
|
76-97
|
400UMA
|
400
|
16
|
200
|
120, 250, 263, 265, 280
|
155, 282, 300, 312
|
40, 56
|
10
|
60-74.5
|
|
400B
|
400
|
20
|
200
|
160, 200, 250
|
200, 240, 290
|
40, 56
|
7.5
|
75-90
|
|
500UMA
|
500
|
20
|
250
|
250, 315
|
300, 375
|
40, 56, 80
|
12.5
|
70.5-98
|
|
500B
|
500
|
25
|
250
|
250, 270, 280, 315
|
300, 320, 375
|
56, 80
|
10.5
|
70.5-98
|
|
Steel Barrel
|
500C
|
500
|
27.5
|
250
|
250, 270, 280, 315
|
300, 320, 375
|
56, 80
|
10.5
|
70.5-98
|
630UMA
|
630
|
25
|
250
|
250, 315, 400
|
300, 375, 475
|
56, 80
|
12
|
70.5-98
|
|
800
|
800
|
35
|
400
|
400, 500
|
500, 600
|
80, 127
|
15
|
115-158
|
|
1000
|
1000
|
40
|
500
|
630
|
750
|
80, 127
|
20
|
114-166
|
Other relevant bobbins that we can supply, such as double layer high speed bobbin, flat high speed bobbin, PN punching bobbin, PND punching bobbin, Metal flange process bobbin, enhanced type machine bobbin, corrugated bobbin, reinforced corrugated bobbin etc…
Steel reel/bobbin exported to USA
Cable Spool
Bobbins Delivery for Australia customer.
Nossa empresa & service:
We are professional bobbin manufacturer with more than 25 years experience.Our company has a technical administration team whom engages bobbin/reel industrial more than twenty years, as well as experienced engineer and skilled workers, our honest business reputation and good sales achievement win the trust from our domestic and overseas customers, the products are exported to United States, France, Spain, Portugal, New Zealand, Brazil, Mexico, Chile,South Africa, Zambia, Egypt, South Korea, Singapore, Indonesia, Thailand,etc.
Factory corner
A2: Trade assurance, T/T, L/C, Weston Union are all accepted.
A3: Average 7-25 days for tooling, bulk orders should be depends on quantity.
A4: In general we use ziplock bag or bubble film plus cardboard boxes, wooden pallets or wooden cased will be used if necessary. Special packing method is available if needed.
A5: It depends on the parts we made. Besides, we will maintain or replace the mould by ourselves.
Enable us to make a quotation for you. Pls kindly revert to us for the below information:
1) Technical drawing of the bobbin
2) Material of the bobbin