Oil Gas Storage Tank Welding Machine for Tank Construction (EGW/AGW)

Modelnr.
AUTO

Suitable for Tank Diameter
Several Meters to One Hundred Meters

Max. Efficiency of Welding Machines
30 Times of Manual Welding(Agw); 50 Times of Manua

Plaats van herkomst
Nanjing

Merknaam
Naec

Certificering
Ce, ISO9001-2008

Huidig
Alternating Current

Sollicitatie
Tank Construction

Transportpakket
Packed in Container

Specificatie
2.8 3.2M

Handelsmerk
NAEC

Oorsprong
China

HS-code
85153190

Productiecapaciteit
200 Sets/Year

Beschrijving

Tank Welding machine & tank construction machine(EGW/AGW)

Functies:

1, Suitable for diameter of several meters to one hundred meters
2, Max. Efficiency of welding machines: 30 times of manual welding(AGW); 50 times of manual welding(EGW)
3, Applicable to both bottom-to-top and top-to-bottom tank erection
4, First X-ray qualification rate: Above 99%


Oil Gas Storage Tank Welding Machine for Tank Construction (EGW/AGW)
Oil Gas Storage Tank Welding Machine for Tank Construction (EGW/AGW)
Oil Gas Storage Tank Welding Machine for Tank Construction (EGW/AGW)
Configuration:

1 Plate cutting & Edge milling machine
2 Automatic girth welding machine(AUTO AGW)
3 Automatic electro-gas vertical welding machine(AUTO EGW)
4 Automatic butt/corner seam welding machine
5 Hydraulic lifting system
6 Automatic girth seam grinder
7 LNG tank welder

For storage tank / tower fabrication and on site construction, we begin to R & D of its automatic equipments and turn-key whole solution since year 2001. After years of development, NAEC developed different fabrication and construction machines for various seams of Oil Storage Tank / LNG Tank / Tower / Tank Farm. The automatic tank welding machines we developed meet CE standard. In the meantime,

NAEC also developed matched equipments for top-to-bottom construction method, which has been widely applied in both China Strategic Oil Storage Project and oversea tank construction project.

Now NAEC has matured equipment for both bottom-to-top and top-to-bottom tank construction. By NAEC solution, we can help our client to finish one tank construction within one month. The X-ray first qualification rate is no less than 99.5%. And the mechanical performance meets the requirements of low-temperature impact test.

Welcome to visit our company in Nanjing, China. For more information please contact us.