説明
Commodity | 出力 | Unit | 重さ | Unit |
500 L Mould | 17 | PC/H | 9 | KG |
750 L Mould | 15 | PC/H | 13 | KG |
1000 L Mould | 12 | PC/H | 18 | KG |
1500 L Mould | 9 | PC/H | 26 | KG |
2000 L Mould | 8 | PC/H | 36 | KG |
仕様 :
No | 仕様 | 2000 Liter | |
Model No. | 4 layers | ||
Processing material | HDPE/HMWHDPE | ||
1 | Extruders | Gear Box Type | Hard surface |
Extruder Drive Motor (Inner) | 55KW | ||
Extruder Drive Motor (Middle1) | 55KW | ||
Extruder Drive Motor (Middle2) | 55KW | ||
Extruder Drive Motor (Outer ) | 55KW | ||
Heating Load | 100KW | ||
2 | Accumulator Die Head |
Heating Load | 85キロワット |
Parison Control Cylinder | 400X40mm | ||
Die-Core size [ 分 / マックス] | 420-560mm | ||
Inverter | シーメンス | ||
マックス. Parison weight | 52KG | ||
3 | Moulding Clamping Unit | CLAMPING PLATEN Size | 1700X1800mm |
MAX MOLD SIZE | 1600X 1900mm | ||
Mould Clamping Force | 1800KN | ||
Mould Thickness | 1010-1600 | ||
Clamping Pull Bar | 140mm | ||
4 | Stretching and Blowing Unit | Spreading stroke | 400-800mm |
Vertical stroke max. | 300mm | ||
5 | Electrical Control Panel | Thickness controller | 100 points Moog |
Main Operation Panel | シーメンス | ||
Die Head Control Temperature Control | シーメンス | ||
6 | 油圧システム | Hydraulic Drive motor (Main) | 45KW |
Hydraulic Drive Motor (Parison Control) | 7.5キロワット | ||
Oil Tank Capacity | 1200L | ||
7 | Gripper | Gripped stroke | 350mm |
Discharge Stroke | 2200mm | ||
8 | Hopper Loader | Loader | 800kg/H 4PCS |
Hopper | 50kg 4PCS | ||
9 | Production rate | 生産性 | 12PCS/h |
Of 1000 LTR. | Product Weight | 18kg | |
10 | Delivery period | 5 months | |
11 | Weight of Machine | 42Ton | |
12 | Size of Machine | [L xW xH ] (M) | 12mx11mx6.5 |
13 | Total power | 425KW | |
14 | Average power Comsumption | 220KW |
Why Choose Us
DELIVERY TIME
5 months after the down payment;
TRAINNING
The Buyer could dispatch their operators to the Seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller’s technician could train the Buyer’s operators in the Buyer’s factory in the periods of installing & adjusting;
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer’s factory. After one week, if the Buyer still needs the training, $100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer’s food & board while installation in buyer’s factory. And the Buyer should also pay for the air ticket for the engineer.
GUARANTEE
The guarantee time is one year after the machines normally works in the Buyer’s factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won’t be listed in guarantee coverage.