תיאור
Mobile concrete surface shot blasting machine adopts this way to get blasting by medium (Steel shot or steel grit) to a very high speed and a certain angle to the work piece surface, this shot blasting medium can clear the work pieces’ surface, and then inside the machine the medium and impurities will be recovered respectively through the vacuum cleaner air and can be reused again.
Our equipment construction is simple and convenient operation, do not need to closed road for construction, the construction cost is low, the equipment has high mobility. The machine is equipped with dust-removal unit, in the process of the construction, it can be done no dust and soilless, no pollution, and the medium can be recycled.
Dates of the Shot Blaster
דֶגֶם: 550 | Voltage: 3-phase 380V, 50הרץ, 63א |
Rated input: 2*11KW | Outer (machine) shell: performance index -54 |
Rated input: 1.1KW | Rated speed: 3000 סל"ד |
Throwing head size: 220מ"מ | Cement surface: ≥300m2/h |
Steel plate surface: ≥80m2/h | Shot blasting width: 550מ"מ |
Forward speed: 0.5-20מ'/דקה | Diameter of the connected vacuum tube: Φ150mm |
Steel shot consumption: less than 100 g/m² | Air compression power:3kw |
Dust removal power: 4kw | Shot blasting machine size:1950*720*1130מ"מ |
Vacuum cleaner size: 1950*1030*1500מ"מ | מִשׁקָל: 540KG |
WHAT CAN SHOT BLASTING BE USED FOR?
1. To clean and prepare surfaces | such as steel, concrete and asphalt.
2. To remove top layers | like paint and epoxy.
3. To remove markings & rubber | from highways, runways, industrial floors and more.
4. To improve skid resistance | on surfaces such as sidewalks, bike paths, roads and runways.
5. To generate optical and aesthetics effects | on surfaces like roads, highways and runways.
Safe and almost dust-free
The vacuum cleaner through the three way blow back soot, using pulse valve, the use of sequence control principle, to ensure that vacuum cleaner circulation loop clear; Use the original fat gather dust hose, ensure connection wear-resisting, reliable; Use of imported filter paper, ensure dust removal effect; Make vacuum cleaner can safe, stable long-term work.
שאלות נפוצות
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 ימים.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, וכו.