N-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 Transistor

Model NO.
AO3415 SOT-23 AFTV

Current
2.8~4.8A

Packing
SOT-23

Reel Size
7′

Transport Package
Reel Pack

Specification
SMD

Trademark
LTV

Origin
China

HS Code
85411000

Production Capacity
5kk/Month

Description

N-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 Transistor
Product Description
Model No. AO3415 SOT-23
Silk Print A19T A5E
Diode Type Triode
Current 2.8~4.2A
Voltage 20V
Features 1. Advanced trench process technology
2. High density cell design for ultra low on-resistance
3. Exceptional on-resistance and maximum DC current capability
Application Ideal for printed circuit board, applied in rectified current in electronic products
Detailed Photos

N-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 Transistor

Product Parameters

N-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 TransistorN-Channel 2.8A~4.8A 20V MOSFET AO3415 AFTV/A5E SOT-23 Transistor

 

FAQ

1. Are you Manufacturer or trading company?

We are a manufacturer only in diode, bridge rectifiers and automotive rectifier diode. We could supply competitive price and fast delivery and good quality with prompt service, we guarantee that we will reply to our customers within 1-12H once we receive the inquiry, we will do the utmost to help to cut down your cost. AND LTV WILL LIKE TO ASSURE ALL THE CUSTOMERS THAT WHATEVER IS WRITTEN ON THE LABEL OF THE PRODUCT IS 100% TRUE
 
2. May I have some samples for testing?

Yes, OF COURSE. We offer free samples for our customers and they only need to pay the freight for samples. If you have order with us, we will deduct the freight from your first order.

3. What about the delivery ?

Usually the lead time is about 1-3 weeks after receiving payment. For many normal parts, we have the quantity in stock and we have the system to ensure the delivery will be on time.

4. What about the payment terms ?

Order amount is less than $10000: 80% Advance,and 20% before shipment.
Order amount is between $10000 and $20000: 50% Advance and 50% before shipment.
Order amount is more than $20000: 30% Advance and 70% before shipment.
 
5. What about the shipment terms ?

FOB shenzhen by sea;
 
We also work with DHL, FEDEX, TNT and etc. For large quantity , it’s up to you to choose the freight forwarder and if you need, we could assist you.